Chain Reaction — creative team building program

WE CREATE AN UNBROKEN CHAIN OF MECHANICAL DEVICES!

THE IDEA

THE IDEA

Teams create a continuous chain of mechanical elements that will function flawlessly from the first to the last component!

Each link in the chain is the result of the creative work of an individual team. Once connected into a shared chain, the links represent a visual display of each team's contribution to a fantastic overall result.

And what’s essential for a good team-building activity – it’s fun and exciting!

THE BUILD

THE BUILD

Participants are split into teams and receive sets of items: from ping-pong balls to construction mesh.

With the help of diagrams, teams collect their materials and build devices, then connect them with the devices of other teams.

TEAMS

TEAMS

Teams of 12-15 people participate in the program.

After the team division and warm-up, the host explains the overall goal and specific program details: each team is to build its own link in the chain.
"Lead Engineers" (instructors) work with the teams.

Instructor responsibilities:
  • Maintain group dynamics and a positive attitude
  • Ensure time is respected
  • Provide help if any problems arise

ROLES

ROLES

To maximize participant engagement, we assign the following roles:

Team Leader (PM): The team’s leader and motivator. Makes decisions and keeps the project on track.

Builders: Create the core devices based on the assigned task.

Testers: "Connect" devices with those of the previous and next teams in the chain.

Designers: Prepare the final team presentation, decorate devices, and work on the final panel.

OVERALL RESULT

OVERALL RESULT

We emphasize the idea of a collective result through a creative task: teams prepare a final panel.

Participants draw images based on our instructions, and only after the mechanism is triggered, they realize that the drawings together form one large artwork.

This is revealed at the end of the Chain Reaction.

THE FINALE

THE FINALE

At the end, teams activate the mechanism!

Each link is triggered one after another. Finally, a spectacular climax awaits: the curtain rises and participants see the artwork they created during the program.

PROGRAM BENEFITS

PROGRAM BENEFITS

  • Unleashes creativity

    While creating imaginative mechanisms, participants show off their resourcefulness.


    We think outside the box and come up with innovations!

  • Brings participants closer together

    Teams collaborate continuously to complete the chain from start to finish.


    Mutual understanding is essential!

  • Strengthens unity through shared achievement

    The memorable final moment leaves a lasting impression.


    Participants experience the success as a product of collective effort, reinforcing team spirit in a positive way.

TIMING
2-4 hours
TIMING
2-4 hours
30 min.
30 min.
Introduction
Team division, warm-up, introductory briefing by the host, instructor introductions, mini team icebreakers.
90–120 min.
90–120 min.
Building phase
Teams build their devices and connect them into a continuous chain. They also work on the collaborative panel.
10–30 min.
10–30 min.
Team presentation
Fun segment with short team presentations where teams show off their devices and share their experiences.
20 min.
20 min.
Finale
Program finale. Chain reaction is activated, final panel is revealed, results are summarized.

CASES

Let's discuss your project

Describe your problem – we will offer a solution and contact you soon.

CONTACTS

Office in Belgrade (Serbia)

ART EVENT d.o.o.
Sjenićka 1, Belgrade, Serbia 11000
PIB 111810656
OTP Banka Srbija AD Beograd
tel.: +381 (61) 658-70-50
e-mail: hello@artevent.rs
e-mail: kate@artevent.rs
Contact us on Telegram
Telegram